Friday, February 4, 2011

Lights Coolers and Vents

The ceiling is all painted, the acoustic tiles are up and most of
the new lights are up!

The traditional florescent lights have been replaced with
LED lights.  These new light fixtures both last longer and
use much less energy!

The east wing looks good too...

To the right of the photographer is the serving line.  On the far side
side of the room are some offices and one of the new coolers is
in the foreground.

Looking down the hallway to the left of the cooler you can see
dry food storage on the right and way down at the end is the
outline of the door that opens to the ramp leading to the
staff dining hall.

The dining hall is to the left of the photographer.  This is take from the far west
corner of the kitchen and really shows how big the new kitchen is.
The serving line will run perpendicular to these new vents on the
far side of the room.

Out back is a huge new cooler.  Located right next to the loading dock,
this will make it very easy to unload cold goods from the truck and get them
right into cold storage.

Wednesday, January 5, 2011

Dining Hall Kitchen Walls Plumbing and More!

The iconic red roof is nearly finished.

Almost all of the plumbing is finished.

Most, if not all of the framing and walls are in.
It's difficult to get an idea of the size of this new
kitchen from any one photo because the room is 
divided by about 4 different walls.
This photo faces the camper dining hall on the
services end of the building.

The serving line will go along the far wall. 
As you can see the ceiling has been painted an 
off-white color.


These are stacks of acoustic tiles that will help
damper the noise caused by chatty eaters.

Wednesday, December 8, 2010

Finishing Up For the Winter

Kitchen/Dining Room



The steel frame for the new reload shack is up.  In the spring,
the frame will be wrapped with wood siding.

Wednesday, December 1, 2010

A Floor, Walls and a Roof!

Lots has changed in the last two weeks check it out. The floor was poured, the walls were framed in and the roof is going on!

This is taken from the corner closest to the laundry room.
The serving line for the camper dining hall is visible in the far shadows.
With snow on the ground, crews are in a hurry to get the roof on and
the walls all sealed up so they can have a little heat while they work inside...

Monday, November 8, 2010

Foundation Continued

This is the last corner of the foundation.
The freezers will be on this side. 

Friday, October 29, 2010

The Sawmill Cabin Interior is Coming Along

CD Quarters

Front Room
Kitchen/Dining Room


Back

The front porch has lots of space!