Kitchen/Dining Room |
The steel frame for the new reload shack is up. In the spring, the frame will be wrapped with wood siding. |
Kitchen/Dining Room |
The steel frame for the new reload shack is up. In the spring, the frame will be wrapped with wood siding. |
This is taken from the corner closest to the laundry room. The serving line for the camper dining hall is visible in the far shadows. |
With snow on the ground, crews are in a hurry to get the roof on and the walls all sealed up so they can have a little heat while they work inside... |
Adding short pieces of rebar to attach the walls to. |
The wand that the man on the right is holding vibrates and settles any air bubbles out of the concrete. |
The electricians were here today laying out the conduit that will be inside the concrete floor. |
Each one of these fresh squares of concrete is several feet deep. The four pads will each support a vertical steel beam. |
The 4 walls of the kitchen foundation will be poured this afternoon.The floor will be poured after the walls an roof are constructed. |
Today the footing was poured for the new kitchen. |
To make the day a little more interesting, we had 60MPH winds and a power outage. |
The new shower-house will have an individual unit with an exterior locking door for each shower. |
The foundation slopes to a trough in the center the trough slopes to one end of the building and feeds a drainage pipe. |
The interior and exterior walls are made of sheet-metal. |
Tying rebar in preparation for next week's concrete pour. |
It will take about 8 sections of rebar similar to this one to complete the concrete footing walls. |
Inside, electricians are working on stripping the old electrical to make room for new, smaller and more energy efficient lights. |
Nice new windows on the front. |
New porch! |
The siding is going on the backside of the cabin |
A new floor is being constructed inside. |