Wednesday, December 8, 2010

Finishing Up For the Winter

Kitchen/Dining Room



The steel frame for the new reload shack is up.  In the spring,
the frame will be wrapped with wood siding.

Wednesday, December 1, 2010

A Floor, Walls and a Roof!

Lots has changed in the last two weeks check it out. The floor was poured, the walls were framed in and the roof is going on!

This is taken from the corner closest to the laundry room.
The serving line for the camper dining hall is visible in the far shadows.
With snow on the ground, crews are in a hurry to get the roof on and