Tuesday, September 21, 2010

Demolition Continues...

Chipping away some of the last bits of foundation
View from top of dirt pile on south side.
We have to dig down about 3 ft everywhere and several more
feet where the edges of the foundation will be.  The remaining
space will be filled with engineering fill which is more stable
than the natural dirt in the area.
The yellow wall above the two orange doors will be removed
by hand so that the rest of the building is not disturbed.

The back of the serving lines.

The serving line has been sealed off to protect the dining hall.